Changsha Parts Sea Co., Ltd.  info@partssea.com

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Zoomlion crane outtrigger side rear lower sliding block

 
SKU:
Availability:
Quantity:

Please feel free to contactus Parts Sea engineers or sales for help if you have no parts No.

tse@partssea.com  |  sales@partssea.com



Where is the installation location of the crane slider? 

Take the four-section arm as an example:

The apical medial side of the basic arm (first segment), the caudal lateral side and apical medial side of the second segment, the caudal lateral side and apical medial side of the third segment, and the caudal lateral side of the fourth segment.


The position of the boom slider of a truck crane is generally arranged from the front to the back. The upper slider of the boom is arranged in the four directions of the rear square box, and the next slider is installed in the front of the square box of the boom. the four directions of the ministry. Generally, supplementary adjustments are made by adjusting screws or by adding gaskets under the slider. The form of the slider is different from the shape of the boom. When adjusting, a certain gap must be ensured between the slider and the boom. However, There should be no swinging, as long as it can move freely without large swings.


Previous: 
Next: 
Get in Touch

Sitemap

About

Spare Parts

Production

Get in touch

Contact

Get in touch

  +86 (731) 85953523 
   +86 173 8899 5550
©2016-2023 Changsha parts sea co., Itd. All rights reserved. ICP2022023066                                                                                                                                                                                          Privacy policy